An engineer is implementing the Cisco ACI fabric and wants to reduce the amount of TCAM resources consumed by the fabric The engineer also needs to ensure that all EPGs m a VRF consume the same services Which action should be taken to meet these requirements?
An engineer must configure a monitoring solution for a Cisco Nexus 9000 Series Switch based data center. The solution must provide real-time insight into the network health with subscription-based monitoring. The monitoring must be initiated from the client side, and the data must be sent via encryption. Which configuration steps complete the configuration?
Refer to the exhibit.
Refer to the exhibit.
Quickly grab our 350-601 product now and kickstart your exam preparation today!
Name: | Implementing Cisco Data Center Core Technologies |
Exam Code: | 350-601 |
Certification: | CCNP Data Center |
Vendor: | Cisco |
Total Questions: | 546 |
Last Updated: | Apr 22, 2024 |
© Copyright https://certsexpert.com 2015- 2024, All Rights Are Reserved.