Question 1

The test team is using a distributed model for testing. What is the primary factor you should consider with this model?


Answer: A
Question 2

What test process is included as part of TPI Next?


Answer: B
Question 3

One of your team members is struggling to identify the requirements to be tested for a project The requirements documents are not conventional but you have determined that the data is there. If they do some digging to find it Given this information in what competence area does this person need to improve?


Answer: B
Question 4

Within the projects, a master test plan and phase test plan will be used. Following is a list
of characteristics applicable for test plans:
a. Any deviation from the procedures described in the test
b. strategy document
c. The overall estimated costs, timescales and resource
d. requirements
e. A detailed schedule of testing activities
f. The development deliverables to be tested
g. Which test staff members (names) will be involved and when
h. Level of requirements coverage achieved
Which TWO of the above mentioned characteristics relate to the phase test plan? 1 credit


Answer: A,C
Question 5

Which of the following would be the TWO most appropriate examples of entry criteria
documented in the system integration test plan? 2 credits


Answer: A,B
Page:    1 / 93   
Total 463 questions | Updated On: Aug 01, 2026

Quickly grab our CTAL-TM product now and kickstart your exam preparation today!

Name: Certified Tester Advanced Level Test Management (CTAL-TM) v3.0
Exam Code: CTAL-TM
Certification: Advance Level
Vendor: ISTQB
Total Questions: 463
Last Updated: Aug 01, 2026