The ISTQB fundamental test process consists of 5 main activities To which of these belongs the task
"Identifying necessary test data"?
Which of the following BEST describes a Test Case?
What is a "test harness"?
Software was found to take much more time than the stated requirement of less than one second to save a file.
Upon investigation it was found that there was an unnecessary check inside a loop which was slowing down
the file-save operation. The software not being able to meet the desired response time is an example of
Given the following decision tables, what is the expected result for the test case listed below?
Test Case: Purchase a Toaster weighing 9kg for £10.
Quickly grab our CTFL_SYLL2018 product now and kickstart your exam preparation today!
Name: | ISTQB Certified Tester Foundation Level |
Exam Code: | CTFL_SYLL2018 |
Certification: | CTFL2018 |
Vendor: | iSQI |
Total Questions: | 356 |
Last Updated: | Apr 25, 2024 |
© Copyright https://certsexpert.com 2015- 2024, All Rights Are Reserved.